defunct762 mm (2 ft 6 in) narrow gauge47 km
Nepal Government Railway (Raxaul–Amlekhganj)
Nepal's first railway, built during the Rana period to move timber and, later, passengers between Raxaul on the Indian side of the border and Amlekhganj in Nepal. It was for decades the only rail-linked step on the journey to Kathmandu, which still had to be completed by road or on foot from Amlekhganj via Bhimphedi.
- Opened
- 1927-02-16
- Closed
- 1965
- Type
- Freight & Passenger
Stations: Raxaul · Birganj · Parwanipur · Jitpur · Simra · Amlekhganj
Today: Fully defunct; no tracks remain in regular use, though part of the alignment was later reused for the Raxaul–Sirsiya broad-gauge freight spur (opened 2004/2005).
defunct (superseded by the modern Jaynagar–Bardibas broad-gauge line)762 mm (2 ft 6 in) narrow gauge51 km
Nepal Janakpur Jaynagar Railway (NJJR) — original narrow gauge
Nepal's second narrow-gauge railway and its longest-surviving original line, operating for over 75 years in some form. Its Janakpur–Bijalpura section was abandoned in 2001 after flood damage; the remaining Janakpur–Jaynagar stretch ran until 2014, when it was closed for a full India-funded broad-gauge rebuild.
- Opened
- 1937
- Closed
- 2014
- Type
- Freight & Passenger
Stations: Jaynagar · Inarwa · Khajuri · Mahinathpur · Baidehi · Parbaha · Janakpurdham · Bijalpura
Today: Superseded by the modern broad-gauge Jaynagar–Bardibas line (see that entry), which follows much of the same alignment.
defunct762 mm (2 ft 6 in) narrow gauge66 km
Kosi Project Railway (Bhimnagar–Dharan/Chatra)
A purpose-built narrow-gauge railway constructed to support the Koshi Barrage project, under the 1954 Nepal–India Koshi Project Agreement. It carried construction material from quarries near Dharan and Chatra to the barrage site at Bhimnagar and briefly ran a monsoon-season passenger service in 1958.
- Opened
- 1957
- Closed
- circa late 1960s
- Type
- Freight (construction material), with brief passenger service
Stations: Bhimnagar · Chhakraghatti · Chatra
Today: Fully defunct and largely erased; almost no visible trace remains beyond a few reused rails and old retention walls.
active1,676 mm (5 ft 6 in) broad gauge6 km
Raxaul–Sirsiya (Birgunj Inland Container Depot line)
A short broad-gauge freight spur built on part of the old Nepal Government Railway alignment, connecting Raxaul to the Sirsiya Inland Container Depot (Birgunj Dry Port). It handles more than 20,000 TEU of containerised cargo annually, almost all of it imports, plus roughly 200,000 tonnes of break-bulk cargo.
- Opened
- 2004
- Type
- Freight only
Stations: Sirsiya (Birgunj Inland Container Depot)
Today: Nepal's busiest and most consistently reliable rail freight corridor; fully operational since 2005.
active (partially operational; final phase under construction)1,676 mm (5 ft 6 in) broad gauge68.72 km
Jaynagar–Janakpur–Bardibas Railway (modern broad gauge)
India-funded reconstruction of the historic Janakpur narrow-gauge line to broad gauge, built by Ircon International. It reopened in phases: Jaynagar–Kurtha (April 2022), Kurtha–Bhangaha/Bijalpura (July 2023), with the final Bhangaha–Bardibas stretch still under construction pending land acquisition. It is Nepal's only regularly scheduled passenger railway.
- Opened
- 2022-04-02
- Type
- Passenger (primary), with some freight capability
Stations: Jaynagar · Inarwa · Khajuri · Mahinathpur · Baidehi · Parbaha · Janakpurdham · Kurtha · Pipradhi/Khutta Pipradhi · Loharpatti · Singyahi · Bhangaha (Bijalpura) · Bardibas (under construction)
Today: As of the dataAsOf date, roughly 52 of the planned 68.7 km are open, with the Bhangaha–Bardibas section (~17 km) still in progress.
active but limited (partial operation, recurring institutional gaps)1,676 mm (5 ft 6 in) broad gauge18.6 km
Bathnaha–Biratnagar (Jogbani–Biratnagar) Railway
An India-funded broad-gauge freight line intended to serve Nepal's eastern industrial hub around Biratnagar. Tested in 2018, formally inaugurated in June 2023, but hampered since then by unclear institutional responsibility between Nepal Railway and the Nepal Intermodal Transport Development Board, plus unfinished construction and compensation disputes on the Katahari extension.
- Opened
- 2023-06-01
- Type
- Freight only
Stations: Biratnagar Integrated Check Post · Budhanagar
Today: As of the dataAsOf date, a November 2025 Letter of Exchange between India and Nepal aimed to enable fuller freight operations, and further extension toward Biratnagar's Integrated Check Post was reported to be in progress.
under construction (very limited overall progress)1,435 mm standard gauge (planned)945.44 km
East-West Railway (Mechi–Mahakali Electric Railway)
Nepal's largest and most ambitious planned railway, conceived in 2007 and formally launched in 2014, divided into nine sections from Inaruwa–Kakarvitta in the east to Sukhad–Gaddachowki in the west. Progress has been overwhelmingly concentrated in the Bardibas–Nijgadh (Chocha) section, with most other sections still at DPR or early construction stage.
- Type
- Passenger & Freight (planned)
Stations: Birtamod · Damak · Itahari · Inaruwa · Lahan · Rajbiraj · Bardibas · Hetauda · Narayanghat · Butwal · Lamahi
Today: As of mid-2026, roughly 68.6 km of trackbed and 16 bridges were complete in the Bardibas–Chocha section; overall project progress since 2014 has been estimated at roughly 5–7%, with recurring land-compensation disputes (e.g. Bardibas, March 2026) and a 2025 government review of possibly rerouting the alignment along the East-West Highway.
DPR completed; awaiting approvals (not yet under construction)1,676 mm (5 ft 6 in) broad gauge, electrified136 km
Raxaul–Kathmandu Railway
A proposed India-funded electrified broad-gauge railway that would give Kathmandu its first direct rail link, cutting the roughly 5-hour road journey from Raxaul to an estimated 2–3 hours by train. First agreed in 2018 and approved by India in 2021, the project's Final Location Survey and Detailed Project Report were completed by Konkan Railway and confirmed by India's Railway Minister in March 2026.
- Type
- Passenger & Freight (planned)
- Est. cost
- Approximately NPR 450 billion / USD 3 billion (2026 estimate)
Stations: Jitpur · Nijgadh · Shikharpur · Sisneri · Sathikhel · Chobhar
Today: As of the dataAsOf date, the project awaits appraisal by India's NITI Aayog and Ministry of Finance, and Nepal has been pushing for grant (rather than loan) financing and greater emphasis on freight viability before construction begins.
feasibility study in progress (not yet at DPR stage)1,435 mm standard gauge (planned)73 km
Kerung–Kathmandu Railway (Trans-Himalayan Railway)
A proposed China-funded standard-gauge railway that would give Nepal its first rail link to the north, running largely underground through the Himalaya via a spiral tunnel system near Langtang National Park to manage the elevation drop from the Tibetan Plateau. First agreed in principle in 2017–2018, a full feasibility study began in December 2022 under a roughly 42-month timeline.
- Type
- Passenger & Freight (planned)
- Est. cost
- Estimates range from about USD 2.75 billion to USD 5.5 billion depending on source and year (roughly NPR 271–380 billion); about 98.5% of the route is expected to run through bridges or tunnels
Stations: Rasuwagadhi (Nepal border point) · Trishuli corridor stations (Nuwakot)
Today: As of the dataAsOf date, the geological survey was reported roughly 90% complete (May 2026), with the final feasibility report targeted for around mid-2026; Claude's research could not confirm whether the report was actually released by that date. Financing terms (grant versus loan) remain a point of discussion between Nepal and China.
proposed1,435 mm standard gauge (planned)187.083 km
Kathmandu–Pokhara(–Lumbini) Railway
A proposed domestic high(er)-speed line connecting Kathmandu to Pokhara, with discussions (including with China) about a possible further link to Lumbini. It remains at an early planning and feasibility stage.
- Type
- Passenger & Freight (planned)
- Est. cost
- Approximately USD 2.8 billion
Today: No construction start date has been set as of the dataAsOf date.
proposed1,435 mm standard gauge (planned)71.72 km
Tamsariya–Aanbu Khaireni Railway
A proposed domestic railway segment; details beyond route and estimated cost remain limited in public sources as of the dataAsOf date.
- Type
- Passenger & Freight (planned)
- Est. cost
- Approximately USD 527 million
Today: Early-stage proposal; no construction start date set.
surveys completed; construction not started1,676 mm (5 ft 6 in) broad gauge (planned)18.5 km
Rupaidiha–Kohalpur Railway
A proposed cross-border line whose surveys were completed in 2018, but construction has not proceeded since, reportedly due to a range of implementation issues.
- Type
- Passenger & Freight (planned)
Today: Dormant since 2018 despite completed surveys.
proposed (uncertain / largely dormant)1,676 mm (5 ft 6 in) broad gauge (planned)330 km
Barhani–Kathmandu Railway
A proposed cross-border rail corridor discussed periodically since around 2016, with essentially no physical progress reported since then.
- Type
- To be determined
Today: No meaningful progress reported since 2016.
proposed1,676 mm (5 ft 6 in) broad gauge (planned)15.3 km
Nautanwa–Siddharthnagar (Bhairahawa) Railway
A short proposed cross-border line linking Nautanwa in India with Bhairahawa in Nepal, near the Lumbini pilgrimage region.
- Type
- Passenger & Freight (planned)
Today: Early-stage proposal as of the dataAsOf date.
proposed1,676 mm (5 ft 6 in) broad gauge (planned)38 km
Kakarbhitta–New Jalpaiguri Railway
A proposed cross-border line connecting Nepal's eastern gateway town of Kakarbhitta with New Jalpaiguri in West Bengal, India.
- Type
- Passenger & Freight (planned)
Today: Early-stage proposal as of the dataAsOf date.
early planning phase1,435 mm standard gauge (planned)
Kathmandu Metrorail
A long-discussed light-rail/metro concept for the Kathmandu Valley, with a government committee formed in 2017 to study it. It remains at a very early planning stage with no confirmed route or timeline.
- Type
- Light rail (planned)
Today: Actual implementation remains uncertain as of the dataAsOf date.