All trains
NR03Janakpur Dham - Jaynagar Passenger (NR 3 DN)
Janakpur Dham → Jaynagar · 29 km · avg 19 km/h · 1h 30m · max 110 km/h
Runs:SunMonTueWedThuFriSat· Daily
Route map
Loading map…
Engine information
| Class | 1600 HP DEMU |
| Traction | Diesel |
| Power | 1600 HP |
| Manufacturer | Integral Coach Factory (ICF), Chennai |
| Built | 2020 |
| Max speed | 110 km/h |
| Weight | N/A |
| Wheel arrangement | AC-AC Controlled Propulsion |
Coach composition · 5 coaches
| Type | Code | Count | Seats |
|---|---|---|---|
| Engine (Diesel Powered) Diesel engine · Traction equipment · Driving cab | DPC | 1 | — |
| General SittingPassenger seating · Bench seats · Luggage rack | GS | 2 | 600 |
| Air-Conditioned Chair CarAir-conditioned seating · Cushioned seats · Fans · Toilet · Reading lights | AC-TC | 1 | 56 |
| General Sitting + EngineDriving cab · Passenger seating | GS+DPC | 1 | 150 |
Rake position— engine on the left, position 1 nearest the engine
ENG1600 HP DEMU
DPC1
GS2
GS3
AC-TC4
GS+DPC5
5 coaches · numbered from the engine · 1600 HP DEMU (Diesel)
Time table
| Station | Arr | Dep | Halt | Km |
|---|---|---|---|---|
| Janakpur DhamJNKPE · PF 1 | Start | 11:45 | — | 0 |
| Deuri ParbahaNR-DERUI · PF 1 | 12:00 | 12:02 | 2m | 6.8 |
| BaidehiNR-BAIDE · PF 1 | 12:08 | 12:10 | 2m | 10.8 |
| MahinathpurNR-MAHIN · PF 1 | 12:20 | 12:22 | 2m | 15.2 |
| KhajuriNR-KHAJU · PF 1 | 12:32 | 12:37 | 5m | 20.7 |
| InarwaNR-INRWA · PF 1 | 12:47 | 12:49 | 2m | 25.3 |
| JaynagarJYS · PF 1 | 13:15 | Final | — | 28.5 |
Fare calculator
Janakpur Dham → Jaynagar
28.5 km · AC Chair Car
Rs.350
NPR · Official chart fare
Rake: Single Rake (2 trainsets) · Updated 2024-12-01