All trains
NR04Jaynagar - Janakpur Dham Passenger (NR 4 UP)
Jaynagar → Janakpur Dham · 29 km · avg 20 km/h · 1h 25m · max 110 km/h
Runs:SunMonTueWedThuFriSat· Daily
Route map
Loading map…
Engine information
| Class | 1600 HP DEMU |
| Traction | Diesel |
| Power | 1600 HP |
| Manufacturer | Integral Coach Factory (ICF), Chennai |
| Built | 2020 |
| Max speed | 110 km/h |
| Weight | N/A |
| Wheel arrangement | AC-AC Controlled Propulsion |
Coach composition · 5 coaches
| Type | Code | Count | Seats |
|---|---|---|---|
| Engine (Diesel Powered) Diesel engine · Traction equipment · Driving cab | DPC | 1 | — |
| General SittingPassenger seating · Bench seats · Luggage rack | GS | 2 | 600 |
| Air-Conditioned Chair CarAir-conditioned seating · Cushioned seats · Fans · Toilet · Reading lights | AC-TC | 1 | 56 |
| General Sitting + EngineDriving cab · Passenger seating | GS+DPC | 1 | 150 |
Rake position— engine on the left, position 1 nearest the engine
ENG1600 HP DEMU
DPC1
GS2
GS3
AC-TC4
GS+DPC5
5 coaches · numbered from the engine · 1600 HP DEMU (Diesel)
Time table
| Station | Arr | Dep | Halt | Km |
|---|---|---|---|---|
| JaynagarJYS · PF 1 | Start | 13:45 | — | 0 |
| InarwaNR-INRWA · PF 1 | 13:55 | 13:57 | 2m | 3.2 |
| KhajuriNR-KHAJU · PF 1 | 14:07 | 14:12 | 5m | 7.8 |
| MahinathpurNR-MAHIN · PF 1 | 14:22 | 14:24 | 2m | 13.3 |
| BaidehiNR-BAIDE · PF 1 | 14:34 | 14:36 | 2m | 17.7 |
| Deuri ParbahaNR-DERUI · PF 1 | 14:44 | 14:46 | 2m | 21.7 |
| Janakpur DhamJNKPE · PF 1 | 15:10 | Final | — | 28.5 |
Fare calculator
Jaynagar → Janakpur Dham
28.5 km · AC Chair Car
Rs.350
NPR · Official chart fare
Rake: Single Rake (2 trainsets) · Updated 2024-12-01